FEUL OIL STORAGE & HANDELING SYSTEMS
Breif Introduction
1. HSD STORAGE : We can make the arrangements of HSD storage in
(i) Horizontal Cylindrical Aboveground Tank as per IS-10987
(ii) Horizontal Cylindrical Underground Tank as per IS-10987
(iii) Vertical Cylindrical aboveground tanks as per IS-803
Flow of HSD can be managed as below
Unloading from Lorry
Bucket type filter
Storage Tank
Day Tank
In case of above ground storage tank , we have to use unloading pump to unload the oil to the storagee tank. Then another pump to be used to transfer pump to transfer oil to day tank. In case of underground tanks unloading of oil shell be by under gravity flow and then we have to use transfer pump to send the oli to tha day tank We have to use use isolation valves, pressure gauges, in between the pipeline to direct the flow of oil. As per the clients requirements oil flow meter can be used to measure the received oil. In all the above cases we have to install an electric control panel with auto-manual option of operation. Transfer pumps can be operated automatically controlled by the lavel switch signal from the day tank
2. HFO STORAGE :
We can make the arrangements of HFO storage in
(i) Horizontal Cylindrical Aboveground Tank as per IS-10987
(ii) Vertical Cylindrical aboveground tanks as per IS-803
Flow of HFO can be managed as below
Unloading from Lorry
Bucket type filter
Storage Tank
Day Tank
Handeling of HFO at the normal atm. temperature is not possible , in this case we have to use steem jacketed / electri heat traced accessories like unloading pump , filter Tanks and all with high temp. insulation to make the oil less viscus . unloading the oil to the storagee tank to be with the help of pump to the storage tank. After centrifuge treatment another pump to be used to transfer pump to transfer oil to day tank. We have to use use isolation valves, pressure gauges,Temp. controllers, regulators etc in between the pipeline to direct the flow of oil. As per the clients requirements oil flow meter can be used to measure the received oil.
In all the above cases we have to install an electric control panel with auto-manual option of operation. Transfer pumps can be operated automatically controlled by the lavel switch signal from the day tank
For any of your enquiry please contact below
|